Baltic Ace

Investigated and advised the P&I Club on suitability of soil conditions around the Baltic Ace area to enable lowering by dredging. This was achieved by analyzing available geological and geotechnical data. When the dredging option proved impractical, a full removal of the wreck was required. Deltares provided expert advice to the salvors on the operational parameters required to safely mount the cutting chains under the vessel using directional drilling.

marine-salvige-baltic_ace_