D-Settlement can also update and reduce the bandwidth during the construction stage, after a fit on measurements.

  • The crude Monte Carlo method determines the bandwidth in total and residual settlements, including the exceedance probability of the allowed residual settlement.
  • The First Order Second Moment (FOSM) method is a quick alternative to approximate the bandwidth in total settlements.
  • The iterative First Order Residual Moment (FORM) method is an alternative to approximate the exceedance probability of the allowed residual settlement.
    Resulting from a reliability analysis is also a graphical overview of the time dependent sensitivity of settlements, for variation of uncertain soil parameters.ettlements with bandwidth, before and after the fit
    ettlements with bandwidth, before and after the fit

D-Settlement comes as a standard module, which can be extended further with other modules to fit more advanced applications